Project Listing 2025 Transportation Plan

Ann Arbor City ~ 2006-2010

UATS Number Name Limits Proposed Improvement Length
(miles)
Urbanized
Area
Total Cost

148

Eisenhower

Boardwalk to Stone School

Reconstruction

0.81

A

$3,000,000

149

Eisenhower

Over AA Railroad

Rehabilitate bridge

0.03

A

375,000

150

Fuller

Fuller Ct to Huron Pkwy

Resurface

0.67

A

800,000

151

Geddes

US-23 to Earhart

Signal Interconnect

0.31

A

100,000

152

Nixon

Dhu Varren to Huron Pkwy

Add Center Turn Lane

0.89

A

1,000,000

153

Pontiac Trail

@ Barton

Improve Intersection

0

A

250,000

154

Stadium

Over State Street

Replace Bridge

0.01

A

1,500,000

155

Stadium

Main to White

Resurface

0.61

A

1,550,000

156

Stadium

Over RR

Replace Bridge

0.02

A

2,250,000

157

State

Eisenhower to Ellsworth

Corridor Study

0

A

100,000

158

Traver

Leslie to Placid Way

Pave Gravel Road

0.8

A

1,000,000

159

Treatment Plant

Over Huron River

Rehabilitate Bridge

0

A

250,000

160

Various Downtown Streets

Downtown Area

Reconstruct/Resurface downtown streets

7.5

A

5,000,000

161

Various Local Streets

City of Ann Arbor

Reconstruction/Resurface local streets

37.5

A

20,000,000

162

Various Locations

City of Ann Arbor

Pavement Rehabilitation

50.0

A

1,250,000

163

Various Locations

City Wide

Intersection Improvement Projects for Congestion

0

A

1,000,000

164

Various Locations

City Wide

2 Miles of Major Road Reconstruction

2.0

A

5,901,000

Home Page The Vehicle Meeting Schedule Traffic Counts Information Request Form