![]() |
Project Listing 2025 Transportation Plan | |
| UATS Number | Name | Limits | Proposed Improvement | Length (miles) | Urbanized Area | Total Cost |
|---|---|---|---|---|---|---|
|
148 |
Eisenhower |
Boardwalk to Stone School |
Reconstruction |
0.81 |
A |
$3,000,000 |
|
149 |
Eisenhower |
Over AA Railroad |
Rehabilitate bridge |
0.03 |
A |
375,000 |
|
150 |
Fuller |
Fuller Ct to Huron Pkwy |
Resurface |
0.67 |
A |
800,000 |
|
151 |
Geddes |
US-23 to Earhart |
Signal Interconnect |
0.31 |
A |
100,000 |
|
152 |
Nixon |
Dhu Varren to Huron Pkwy |
Add Center Turn Lane |
0.89 |
A |
1,000,000 |
|
153 |
Pontiac Trail |
@ Barton |
Improve Intersection |
0 |
A |
250,000 |
|
154 |
Stadium |
Over State Street |
Replace Bridge |
0.01 |
A |
1,500,000 |
|
155 |
Stadium |
Main to White |
Resurface |
0.61 |
A |
1,550,000 |
|
156 |
Stadium |
Over RR |
Replace Bridge |
0.02 |
A |
2,250,000 |
|
157 |
State |
Eisenhower to Ellsworth |
Corridor Study |
0 |
A |
100,000 |
|
158 |
Traver |
Leslie to Placid Way |
Pave Gravel Road |
0.8 |
A |
1,000,000 |
|
159 |
Treatment Plant |
Over Huron River |
Rehabilitate Bridge |
0 |
A |
250,000 |
|
160 |
Various Downtown Streets |
Downtown Area |
Reconstruct/Resurface downtown streets |
7.5 |
A |
5,000,000 |
|
161 |
Various Local Streets |
City of Ann Arbor |
Reconstruction/Resurface local streets |
37.5 |
A |
20,000,000 |
|
162 |
Various Locations |
City of Ann Arbor |
Pavement Rehabilitation |
50.0 |
A |
1,250,000 |
|
163 |
Various Locations |
City Wide |
Intersection Improvement Projects for Congestion |
0 |
A |
1,000,000 |
|
164 |
Various Locations |
City Wide |
2 Miles of Major Road Reconstruction |
2.0 |
A |
5,901,000 |
| Home Page | The Vehicle | Meeting Schedule | Traffic Counts | Information Request Form |
|---|