Project Listing 2025 Transportation Plan

Michigan Department of Transportation ~ 2001-2005

UATS Number Name Limits Proposed Improvement Length
(miles)
Urbanized
Area
Total Cost
75 Access Study N Ann Arbor Area (M14) Study (TEA-21 DEMO) 0 A 938,000
76 I-94 EB I-94BL Ramp Under Jackson Ave Beam End Repair, Paint, Overlay 0 A 425,000
77 I-94 @ Baker Road New EB On Ramp + Interchange Improvements 0 A 8,500,000
78 I-94 @ Zeeb Road New EB On Ramp + Interchange Improvements 0 A 9,800,000
79 M-14 I-94 to US-23BR Rubblize & Resurface 3.87 A 3,979,000
80 M-52 Old US-12 to Sibley Mill & Resurface 1.23   1,062,000
81 US-12 Saline to Munger Widen/Interchange Upgrade 6.5 A 43,001,000
82 US-12 Austin to Saline River Widen for Turn Lanes 0 A 2,500,000
83 US-12 Under Eight Mile Rd Replace Structure 0   2,500,000
84 US-23 NB over Conrail & the Huron River Beam Repair, Railing Replacement & Overlay 0 A 775,000
85 US-23 SB over Conrail & the Huron River Beam Repair, Railing Replacement & Overlay 0 A 775,000
Amendment University of Michigan Non-Motorized Bridge UM Life Sciences Complex to the Medical Center Complex Non-Motorized Path 0 A 2,500,000

 
Home Page The Vehicle Meeting Schedule Traffic Counts Information Request Form