Project Listing 2025 Transportation Plan

Washtenaw County Road Commission ~ 2011-2015

UATS Number Name Limits Proposed Improvement Length
(miles)
Urbanized
Area
Total Cost
259 Carpenter  Bemis to Textile Widen to 4 lanes with 5 lanes at the intersection 2.0 A $3,684,000
260 Jackson Baker to Parker Widen to 4 Lane Blvd 1 A 4,000,000
261 Jackson Phase III Honey Creek to Baker Widen to 4 Lane Blvd 1.8 A 7,200,000
262 Parker Dexter-Chelsea to Dexter-Pinckney Construct 2 lane bypass 0.8 A 2,000,000
263 Rawsonville Bemis to Textile Widen and reconstruct to 5 lanes 1.5 A 3,000,000
264 Rawsonville Willis to Bemis Pavement Rehabilitation 1   2,200,000
265 State Textile to Morgan Widen to 5 lanes, Curb and gutter 1 A 2,000,000
266 State Textile to US-12 Widen to 5 lanes, Curb and gutter 1.2 A 2,400,000
267 Textile Huron River Dr to Rawsonville Pavement Rehabilitation 1.5 A 1,500,000
268 Various Bridges County Wide Rehabilitate/Reconstruct 8 bridges 0 A 3,200,000
269 Various Locations County Wide Signal & turn lanes 0 A 500,000
270 Various Locations 100 miles of County  Roads Pavement Rehabilitation 100 A 5,000,000
271 Various Locations County Wide Widen, Rehab, Improve Signals @ 20 intersections 0 A 10,000,000
272 Various Locations County Wide Reconstruct existing 2 lane roads 3   3,512,000
273 Various Locations County Wide Replace 20 Culverts 0   500,000
274 Various Locations County Wide Reconstruct existing 2 lane roads 0.5 MI/yr 2.5 A 5,000,000
275 Zeeb Jackson to Dexter-Ann Arbor Widen to 4 lanes with 5 lanes at the intersections 1.4 A 2,800,000

 