| UATS Number | Name | Limits | Proposed Improvement | Length (miles) | Urbanized Area | Total Cost |
|---|---|---|---|---|---|---|
| 137 | Congress | Mansfield to Michigan | Pavement/curb rehab, improve Michigan intersection | 0.78 | A | 150,000 |
| 138 | First | Michigan to Harriet | Pavement and curb rehabilitation | 0.33 | A | 200,000 |
| 139 | Grove | Emerick to Michigan | Pavement/curb rehab, improve Emerick intersection | 0.8 | A | 400,000 |
| 140 | Michigan Non-Motorized Link Study | US-12 at Huron River | Study to evaluate linkage between Riverside Park and Water Street area across US-12 | 0 | A | 45,000 |
| 141 | Michigan Signal Interconnect | Hamilton to Hewitt | Signal Interconnect | 2.52 | A | 456,000 |
| 142 | N. Campus Corridor Non-Motorized Path | Hewitt to Leforge | Non-motorized path and scenic overlook | 1.4 | A | 495,000 |
| 143 | Oakwood | EMU Oakwood Lot to Huron River Dr | Widen to 3 lanes. Left lane at Huron River Dr | 0.46 | A | 500,000 |
| 144 | River Corridor Pathways | Riverside and Frog Island Parks | Non-motorized path redevelopment | 1.04 | A | 75,000 |
| 145 | Riverside Plaza | Cross at Huron | Pedestrian plaza entry | 0 | A | 225,000 |
| 146 | Spring Street Bridge | Over Huron River | Replace surface, railing repairs, misc. repairs. | 0.04 | A | 200,000 |
| 147 | Summit | Michigan at Cross | Rehab, minor widening from Michigan to Sheridan | 0.59 | A | 250,000 |