< < Back < < Project Listing 2025 Transportation Plan

Ann Arbor City ~ 2001-2005

UATS Number Name Limits Proposed Improvement Length
(miles)
Urbanized
Area
Total Cost

1

Broadway

Depot St & PCRR and over Huron River

Replace bridges

0.133

A

$14,000,000

2

Brooks

Mixtwood to Sunset

Install non-motorized path

0.341

A

155,000

3

Catherine/Ann/Glen

Adjacent to U-M Medical Campus

Modification to existing traffic circulation on city streets SW of medical campus

0

A

200,000

4

Citywide

City of Ann Arbor

Stop controlled intersections improvements

0

A

560,000

5

Citywide

City of Ann Arbor

Downtown and Corridor Safety Study

0

A

150,000

6

Citywide Transportation Plan Update

City of Ann Arbor

Macro-view plan of the local Multi-Modal transportation issues

0

A

500,000

7

Dexter

Maple to Doty

Install non-motorized path

0.473

A

250,000

8

Dhu Varren

Omlesaad to Foxfire

Pave gravel road

0.23

A

400,000

9

Fifth Ave

Beakes to Huron

Resurface

0.331

A

157,000

10

Fourth Ave

Catherine to Huron

Resurface

0.133

A

84,000

11

Glendale

Jackson to Fair

Install non-motorized path

0.218

A

70,000

12

Green

Glazier Way to Baxter

Install non-motorized path

0.71

A

150,000

13

Huron Parkway

From 180 meters south of Huron River Dr, southerly 890 meters

Reconstruction

0.44

A

1,825,000

14

Huron Parkway

Plymouth to Baxter

Reconfigure boulevard islands due to Parke-Davis Traffic

0.51

A

200,000

15

Ingalls

Kingsley to Huron

Resurface

0.256

A

119,000

16

Kinglsey

State to Ingalls

Resurface

0.128

A

50,000

17

Liberty

C L to 75' west of Maple

Reconstruct and add center turn lane

0.57

A

800,000

18

Liberty

Stadium to Virginia

Reconstruct and add center turn lane

0.568

A

1,266,000

19

Liberty

Virginia to Seventh

Reconstruction

0.445

A

1,733,000

20

Maiden Lane

Plymouth to Wall

Install non-motorized path

0.142

A

93,000

21

Main

Stadium to Ann Arbor-Saline

Signal Interconnect

0.691

A

50,000

22

Maple

Miller to M-14

Reconstruction

0.426

A

1,000,000

23

Maple

Stadium Blvd to 200' S of Stadium

Resurface

0.04

A

20,000

24

Miller

Maple to M-14

Install non-motorized path

0.398

A

185,000

25

Nichols Arboretum Non-motorized linkage

Nichols Arboretum to Gallup Park

Construct non-motorized tunnel under railroad

0

A

450,000

26

Nixon

@ Huron Parkway

Install new signal

0

A

80,000

27

North University WB

State to Fletcher

Resurface

0.199

A

87,000

28

Oakbrook

Harbor House to Boardwalk

New Street

0.5

A

2,116,000

29

Packard

Sylvan to Stadium

Reconstruction

0.559

A

1,700,000

30

Packard

LaSalle to Cherrytree

Install non-motorized path

0.568

A

98,000

31

Packard

State to Sylvan

Reconstruction

0.365

A

1,250,000

32

Packard

@ Turnberry

Install new signal

0

A

80,000

33

Packard Rd

Eisenhower to Stadium

Signal Interconnect

1.46

A

223,000

34

Pauline

Maple to Stadium

Resurface

0.53

A

260,000

35

Phoenix Dr

Varsity to Varsity

Resurface

0.398

A

150,000

36

Platt

Lorraine to Ellsworth (I-94)

Install non-motorized path

0.417

A

120,000

37

Plymouth

@ Huron Parkway

Add right-turn on eastbound Plymouth

0.1

A

200,000

38

Plymouth

@ Commonwealth

Install new signal

0

A

80,000

39

Plymouth

@ Traverwood

Install new signal

0

A

80,000

40

Research Park

State to Research Park

Resurface

0.95

A

370,000

41

S Main Street Non-motorized Path/Mallets Creek Drain Crossing

Over Mallets Creek

Construct non-motorized crossing

0

A

120,000

42

Scio Church Rd

Maple to Covington

Install non-motorized path

0.208

A

274,000

43

SCOOTS

City of Ann Arbor

Upgrade of master signal control system

0

A

1,600,000

44

Seventh

Stadium to Scio Church

Install non-motorized path

0.644

A

250,000

45

Seventh

Scio Church to Miller

Signal Interconnect

2.22

A

339,000

46

Sidewalk Ramps

City of Ann Arbor, DDA District

Curb Ramp Installation

0

A

114,000

47

South University

S State to Washtenaw Av

Resurface

0.502

A

239,000

48

Stadium

Pauline to Liberty

Reconstruction

0.511

A

2,795,000

49

Stadium

Liberty to Abbott

Reconstruction

0.426

A

2,702,000

50

Stone School

Eisenhower to I-94

Install non-motorized path

0.464

A

75,000

51

Various Downtown Streets

Downtown Area

Reconstruction/Resurface downtown streets

7.5

A

3,000,000

52

Various Locations

City of Ann Arbor

Signal System

0

A

180,000

53

Various Streets

City of Ann Arbor

Reconstruction/Resurface local streets

37.5

A

13,964,000

54

Various Streets

City of Ann Arbor

Pavement Rehabilitation

50

A

1,250,000

55

Washtenaw

@ Palmer

Install new signal

0

A

90,000

Amendment Washtenaw Tuomy to Glenwood Construction of non-motorized path/associated grading/retaining wall 0 A 825,000
Amendment Study City of Ann Arbor Bicycle Master Pland Update 0 A 100,000
Amendment University of Michigan Non-Motorized Bridge UM Life Sciences Complex to the Medical Center Complex Non-Motorized Path 0 A 2,500,000