| UATS Number | Name | Limits | Proposed Improvement | Length (miles) | Urbanized Area | Total Cost |
|---|---|---|---|---|---|---|
| 346 | Non-Motorized Paths Phase 6 | Along Forest, Third & Edison Sts | Non-Motorized path design & construction | 0.986 | A | $212,000 |
| 347 | Various Streets | Village Wide | Resurface | 3 | A | 139,000 |