East Stadium Improvement Project Update
/
Notice of Updated Temporary Traffic Control Plan
E. Stadium Improvement Project
Phase II: July 6, 2012 to August 10, 2012
Location and Limits of Affected Area:
E. Stadium Blvd. between Packard Road and Brockman Blvd.
Description of Work:
The E. Stadium Improvement Project includes the installation of new 8-inch water mains on north and south sides of the street between Packard and Brockman and resurfacing of the E. Stadium Blvd. from Packard Rd. to Washtenaw Ave. The construction includes four major phases, where Phase I includes the installation of the new water main along the north side of E. Stadium Blvd. between Packard and Brockman, Phase II includes the installation of the new water main along the south side of E. Stadium Blvd. between Packard Rd. and Brockman Blvd., and Phases III and IV will resurface the pavement along the north and south sides of E. Stadium Between Brockman Blvd. and Washtenaw Ave.
Updated Temporary Construction Traffic Control Plan:
For the duration of Phase II construction at E. Stadium Blvd. between Packard Road and Brockman Blvd., there will be one eastbound and two westbound lanes of traffic. Pedestrian traffic will be maintained on both sides of E. Stadium Blvd during this phase of construction.
To maintain the safety of all, please reduce speeds and drive cautiously through work zones. We thank you in advance for your patience as these necessary public infrastructure improvements are completed.
.
E. Stadium Improvement Project
Phase II: July 6, 2012 to August 10, 2012
Location and Limits of Affected Area:
E. Stadium Blvd. between Packard Road and Brockman Blvd.
Description of Work:
The E. Stadium Improvement Project includes the installation of new 8-inch water mains on north and south sides of the street between Packard and Brockman and resurfacing of the E. Stadium Blvd. from Packard Rd. to Washtenaw Ave. The construction includes four major phases, where Phase I includes the installation of the new water main along the north side of E. Stadium Blvd. between Packard and Brockman, Phase II includes the installation of the new water main along the south side of E. Stadium Blvd. between Packard Rd. and Brockman Blvd., and Phases III and IV will resurface the pavement along the north and south sides of E. Stadium Between Brockman Blvd. and Washtenaw Ave.
Updated Temporary Construction Traffic Control Plan:
For the duration of Phase II construction at E. Stadium Blvd. between Packard Road and Brockman Blvd., there will be one eastbound and two westbound lanes of traffic. Pedestrian traffic will be maintained on both sides of E. Stadium Blvd during this phase of construction.
To maintain the safety of all, please reduce speeds and drive cautiously through work zones. We thank you in advance for your patience as these necessary public infrastructure improvements are completed.
.