Geddes Ave Construction and Traffic Control

Notice of Temporary Traffic Control Plan
July 23 – August 24, 2012

Location and Limits of Affected Area:
Geddes Avenue from Highland Road to Apple Way
Description of Work:
This project will include repair of the road pavement to eliminate pot holes, provide a smoother driving surface, and increase the service life of the road. It will also include the replacement of sidewalk ramps to meet current Americans with Disability Act Standards.

Temporary Construction Traffic Control Plan:
For much of the construction, two-way traffic will be maintained with the use of flaggers during construction hours. Construction between Awixa and Apple Way will require approximately 2 weeks of a full closure to through traffic. During this time, eastbound traffic will be detoured; 1) Washtenaw to Huron Pkwy or 2) Hill St to Devonshire to Arlington. Westbound traffic will be detoured; 1) Huron Pkwy to Washtenaw, or 2) Arlington to Devonshire to Hill. See attached map.

Local access for vehicular traffic and pedestrian traffic will be maintained except when vehicular traffic may be temporarily restricted due to paving or concrete work. Residents will be notified if a driveway is affected.