Seventh Street Traffic Control Plan
/
Notice of Temporary Traffic Control Plan
Location and Limits of Affected Area:
S. Seventh Street from Pauline to Madison.
July 23 – September 1, 2012
Description of Work:
This project will include reconstruction of the road pavement to eliminate pot holes, provide a smoother driving surface, and increase the service life of the road. It will also include the replacement of sidewalk ramps to meet current Americans with Disability Act Standards.
Temporary Construction Traffic Control Plan:
Southbound traffic will be maintained and northbound traffic will be detoured. The detour route for northbound traffic will be Pauline to Main St to Madison. See attached map.
Local access for vehicular traffic and pedestrian traffic will be maintained except when vehicular traffic may be temporarily restricted due to paving or concrete work. Residents will be notified if a driveway is affected.
To maintain the safety of all, please reduce speeds and drive cautiously through work zones.
Pedestrian traffic will be maintained on at least one side of the street during this project.
Location and Limits of Affected Area:
S. Seventh Street from Pauline to Madison.
July 23 – September 1, 2012
Description of Work:
This project will include reconstruction of the road pavement to eliminate pot holes, provide a smoother driving surface, and increase the service life of the road. It will also include the replacement of sidewalk ramps to meet current Americans with Disability Act Standards.
Temporary Construction Traffic Control Plan:
Southbound traffic will be maintained and northbound traffic will be detoured. The detour route for northbound traffic will be Pauline to Main St to Madison. See attached map.
Local access for vehicular traffic and pedestrian traffic will be maintained except when vehicular traffic may be temporarily restricted due to paving or concrete work. Residents will be notified if a driveway is affected.
To maintain the safety of all, please reduce speeds and drive cautiously through work zones.
Pedestrian traffic will be maintained on at least one side of the street during this project.